Friday, April 30, 2010

DAY 38 - The fixtures are installed, Tile in the Shower and tub area, curbing in front yard for landscapers.

DAY 38 - Apr 30, 2010
Landscape curbing was poured

That main front area between the curbing will have one tree and grass

We have tile around the Master tub

My shower bench

Roof tile still moving very slow

Thursday, April 29, 2010

DAY 37 - The House is moving fast, we have linoleum flooring and cabinets.

DAY 37 - Apr 29, 2010
We have cabinets, linoleum flooring, garage doors, and roof tiles on the back of the house. The front yard sprinkling system being installed, with the rest of the landscaping tomorrow.
The Kitchen Cabinets with extended island

The flooring looks good

Landscaping tomorrow

Linoleum Flooring (One day, will cover it with Laminate flooring)

Garage doors were installed

Wednesday, April 28, 2010

DAY 36 - Painting of the inside is complete, applying the final stucco coat and paint has begun and will be finnish today.

DAY 36 - Apr 28, 2010
The two tone paint has been applied and now the doors and base boards have been painted the correct color
Applying the stucco texture paint (Concord is the color)

That wall was gray ten minutes ago! They work fast!!!

The Master Bed room doors that enter into the Master sitting room

We still have the wrong front door, the saga continues.

Boys room, notice the two tones of paint

Tuesday, April 27, 2010

DAY 35 - The fresh paint is drying, but the inside was only painted with one tone. Oops

DAY 35 - Apr 27, 2010
10 days left for Salisbury Homes to make their 45 day promise.
The gray roof tile has been removed

I checked the house this afternoon and found the inside painted, but it was all one tone. We ordered two tone paint. The painters have to let the paint dry and then start re-masking, for the baseboards, frames and doors to be repainted.

The doors all were painted the wrong color

The archways look cool

Pantry shelves



House Tour Video

Monday, April 26, 2010

DAY 34 - The painting has begun in the house while the roof tile is being replaced with the correct color

DAY 34 - Apr 26, 2010
The Painters were spraying the primer coat on the inside.
View from the neighbors across the street

The Back Patio looks great

Removing the gray roof tiles

Brown blend vs Gray blend

The Brown blend tiles waiting to be installed

Friday, April 23, 2010

DAY 31 - We have concrete, the Driveway, Patio, Walks and Pads

DAY 31 - Apr 23, 2010
The day the concrete came
The Drive way looks Great, the edges and middle between the two garages is Stamped.

Stamped Concrete

Aidan inspected the house

Sanding the walls continues, almost ready for the finnish carpenter.

Stamping the back Patio.

Thursday, April 22, 2010

DAY 30 - Mudded, Concrete forms in place for Driveway, Walks, Patio and AC pads. Roof-We have a problem, Wrong tile!

DAY 30 - Apr 22, 2010
Happy Earth Day, we had another bad weather day, cold and wet.
The Driveway and walks are ready for concrete

We have a roof color problem, Yes the color was wrong it was too Gray.
They'll be removing the Gray tile tomorrow and installing the correct Brown Blend.

Our roof tile should be this color Brown Blend

The house looks great inside, the walls are completely mudded

The Rock on the front of the house is almost complete

Wednesday, April 21, 2010

DAY 29 - Roofing continues, sanding the tapping inside, prepping for Mud, and Rocking has begun on the outside

DAY 29 - Apr 21, 2010
The Roof still looks gray to me


We're getting Rocked!

DAY 28 - We have our base layer of Stucco and Roofing has begun

DAY 28 - Apr 20, 2010
Roofing, Stucco and bad weather. The wind is blowing 30mph with rain and cold coming.

This is the base stucco layer, the house will not be this color.

The roof tile is called Brown blend. Right now it looks really gray, but we have been told that it is the right color and when it is fully installed with the stucco painted it will look brown.

Monday, April 19, 2010

DAY 27 - Still waiting for Roof tile and mudding

DAY 27 - Apr 19, 2010

The shower floor was poured, prepping for the tile

The curb was cutout for the driveway

Friday, April 16, 2010

DAY 24 - Taping completed waiting for roof tiles and stucco

DAY 24 - Apr 16, 2010
Taped and ready for mud


Boys room

Garage

Thursday, April 15, 2010

DAY 23 - Taping the sheetrock continues and the house is ready for stucco

DAY 23 - Apr 15, 2010
The house was inspected by the city, and sheetrock taping continues.